How We Work & Project Timeline
Every Gardenscapes job runs in the same order. We reply, we visit the plot for free, you receive a fixed, itemised written quote, approvals are obtained where your community needs them, and the garden is built with planting last. Gardenscapes is a new brand of Garden Glow Landscaping LLC, so this page describes the process, not past projects, because there are none to show yet.
The stages at a glance
| Stage | What happens | Timing |
|---|---|---|
| 1. First contact | We reply, ask a few questions about the space and agree a time to visit | We reply within 2 hours during working hours |
| 2. Free site visit | The plot is measured, and sun and shade, soil, drainage, irrigation points and access are checked | At a time agreed when we reply |
| 3. Design and quote | A planting and materials plan with fixed, itemised pricing | After the site visit |
| 4. Approvals | NOC drawings and specifications are prepared for your application, where your community needs an NOC | Set by the community or authority, not by us |
| 5. Installation | Hardscape and irrigation first, planting last | The programme is set in your written quote |
| 6. Handover and aftercare | Final checks, care instructions, and a maintenance plan if you want one | At the end of installation |
1. You get in touch and we reply
Call, WhatsApp, email or use the form on the contact page. We reply within 2 hours during working hours, which are Monday to Saturday, 07:00 to 22:00. We ask a few questions about the space and agree a time to visit.
Nothing is required before the visit, but photos or a short video sent by WhatsApp help us prepare. The contact page lists what is useful to send.
2. Free site visit
The site visit is free and it comes before any price. The plot is measured, and sun and shade, soil, drainage, irrigation points and access are checked.
3. Design and a fixed, itemised quote
After the visit you receive a planting and materials plan with itemised pricing. The written quote is fixed, and it shows:
- materials and quantities, listed line by line
- what is included and what is excluded
- authority and engineer fees as separate lines, where they apply
- each service as its own section when a project combines several
- anything that cannot be priced until it has been seen, such as deep foundations or hidden ground conditions, named as an exclusion or a separate line
You can ask for two specifications to be priced side by side, such as two paving materials or two turf options. See the pricing guide.
4. Approvals, where your community needs them
If your community needs an NOC, we prepare the drawings and specifications for your application. You apply through the community. On mainland plots under Dubai Municipality, a registered engineer or consultant applies on your behalf. Work should only start once approval is issued.
Review fees and processing times belong to the community or authority, so they are confirmed at application. Our landscaping NOC guide sets out the routes by community, and our pergola approval guide covers shade structures.
5. Installation: hard work first, planting last
Hardscape and irrigation should go in first and planting last. In practice the order is:
- Ground preparation. Clearing, levelling, excavation and a compacted aggregate base where paving or turf will sit.
- Hard landscaping. Paving, low walls, steps, decking and pergola footings. See hardscaping and pergolas.
- Irrigation. Pipes, valves, emitters and controllers are installed and tested zone by zone. See irrigation.
- Planting and turf. Beds are prepared and everything is planted to the specification in your written quote.
Two trades sit outside our scope and are sequenced around: a pool contractor builds any pool shell, and a licensed electrician makes the final electrical connection for lighting, fans or motorised roofs.
Planting has a season. October to March is the main planting window in Dubai, so if a build finishes in summer the hot months can be used for hard landscaping, irrigation and soil work, with planting when the weather cools. Our planting calendar has the detail.
6. Handover and aftercare
On a villa landscaping project, drainage, levels, planting density and lighting are checked against the drawings before handover, followed by a final walkthrough with care instructions and a suggested maintenance schedule. On an irrigation job we set the seasonal schedules and show you how to adjust them for summer and winter.
Ask for any handover items you want, such as a watering schedule and care notes, to be written into the quote. Garden maintenance after handover is a separate agreement, and plant replacement after handover is quoted as new work unless your written quote says otherwise.
How long a project takes
There is no honest single answer before the site visit. The time depends on four things:
- the scope of the design
- whether community approvals are needed
- material lead times
- the state of the existing plot
Your written quote sets the timeline for your project, and you can ask for it to be stated next to the scope before you approve anything.
Frequently asked questions
Will you give me a price before the site visit?
No. A figure given before anyone has seen the plot is a guess, not a quote. The visit is free, and the fixed written quote follows it.
Is the quote a fixed price or an estimate?
A fixed written quote, with materials and quantities itemised and a clear list of what is included and excluded.
Who applies for the NOC?
The owner applies through the community, using the drawings and specifications we prepare. Where Dubai Municipality is the authority, a registered engineer or consultant submits on the owner's behalf.
What happens after the garden is finished?
You receive the handover items written into your quote. A maintenance plan can follow as a separate agreement, with visit frequency and scope set out in writing.
Book a free site visit or call +971 54 171 7727.
Ready to plan your garden?
Get a free site visit and a fixed, itemised written quote for your Dubai garden.
Request a quote
Free site visit · Fixed written quote · We reply within 2 hours during working hours